New Assiut Power Plant 1000 MW – Fast Track Simple Cycle

project details

New Assiut Power Plant 1000 MW – Fast Track Simple Cycle

Region: Egypt Status: Completed

PLANT DESCRIPTION

The ARRE (8) CTS. CE Stem 9171E dual fired Gas Turbine Generator equipment package, along with all necessary balance of plant systems, is utilized in this power plant. The primary fuel used is heavy fuel oil (Mazout), while the secondary fuel is light fuel oil (Solar). The power generated is stepped up through main transformers and then supplied to the utility 220 kV grid via a gas-insulated switchgear (GIS) switchyard. The plant relies on ground water as its water source.

The major components and systems within the plant include the power block (consisting of the gas turbine, generator, and associated equipment), balance of plant systems (such as transformers, switchgears, diesel generator, auxiliary components, boiler, DCS, and other mechanical/electrical systems), a 220 kV GIS, heavy fuel oil treatment plant, fuel tank farm, and a water treatment plant.

Project Details

Owner

Upper Egypt Electricity Production Company (UEEPC)

Client

Orascom Construction (Partner to GE in the EPC Consortium)

Location

Egypt, Damietta

Date of Award

January 2014

Scope

Full EPCM services for the power plant including but not limited the power train, all supporting Balance of plant and auxiliaries, the scope covers engineering, procurement, project and construction management.

Related Project

Power Projects

Cairo West 650 MW Supercritical Power Plant

By: Cairo Electricity Production Company Date: 2015

Power Projects

Assiut 650 MW Supercritical Power Plant

By: Upper Egypt Electricity Production Company Date: 2015

Power Projects

South Helwan 3 x 650 MW Supercritical Power Project

By: Upper Egypt Electricity Production Company Date: 2011

Power Projects

Suez 650 MW Thermal Power Project

By: East Delta Electricity Production Company Date: 2010

Power Projects

El Ain El Sokhna 2 x 650 MW Supercritical Power Project

By: East Delta Electricity Production Company Date: 2008

Power Projects

New Abu Qir 2 x 650 MW Thermal Power Project

By: West Delta Electricity Production Company Date: 2007

Power Projects

Cairo West 2 x 350 MW Thermal Power Project

By: Cairo Electricity Production Company Date: 2006

Power Projects

El Tebbin 2 x 350 MW Thermal Power Project

By: Cairo Electricity Production Company Date: 2005

Power Projects

Sidi Krir 3&4 2 x 340 MW BOOT Project

By: InterGen Date: 1998

Power Projects

Ayoun Moussa 2 x 325 MW Thermal Power Project

By: East Delta Electricity Production Company Date: 1994

Power Projects

Sidi Krir I&II 2 x 325 MW Thermal Power Project

By: West Delta Electricity Production Company Date: 1994

Power Projects

6th of October I - 600 MW Simple Cycle Power Plant

By: Cairo Electricity Production Company Date: 2011

Power Projects

New West Damietta 500 MW – Fast Track Simple Cycle

By: East Delta Electricity Production Company Date: 2014

Power Projects

Borg El Arab 30 MW Simple Cycle Project

By: Kahraba National Electricity Technology Co. Date: 2015

Power Projects

Damietta 500 MW Simple Cycle Power Plant

By: East Delta Electricity Production Company Date: 2010

Power Projects

6th of October II - 600 MW Simple Cycle Power Plant

By: Cairo Electricity Production Company Date: 2013

Power Projects

West Damietta 500 MW Simple Cycle Power Plant

By: East Delta Electricity Production Company Date: 2011

Power Projects

Al Shabab 1000 MW Simple Cycle Power Plant

By: East Delta Electricity Production Company Date: 2010

Power Projects

Al Shabab Power Project Phase II

By: East Delta Electricity Production Co. Date: 2020

Power Projects

Luxor Combined Cycle Project

By: ACWA Power Date: 2019

Power Projects

West Damietta 750 MW

By: East Delta Electricity Production Company Date: 2019

Power Projects

Burullus Power Project 4800 MW

By: Middle Delta Electricity Production Company Date: 2015

Power Projects

New Capital Combined Cycle Power Plant - 4800 MW

By: Cairo Electricity Production Company Date: 2015

Power Projects

New Assiut Add -On Power Plant 500 MW

By: Upper Egypt Electricity Production Company Date: 2015

Power Projects

New West Damietta ADD-On Power Plant 250 MW

By: East Delta Electricity Production Company Date: 2015

Power Projects

West Damietta ADD-On Power Plant 250 MW

By: East Delta Electricity Production Company Date: 2013

Power Projects

Al Shabab ADD-On Power Plant 500 MW

By: East Delta Electricity Production Company Date: 2013

Power Projects

Giza north I II III-3x750 MW

By: Cairo Electricity Production Company Date: 2010

Power Projects

BANHA POWER PLANT 750 MW

By: Middle Delta Electricity Production Company Date: 2010

Power Projects

EL ATF Power Plant 750 MW

By: Middle Delta Electricity Production Co. Date: 2007

Power Projects

Sidi Krir Combined Cycle Power Plant 750 MW

By: West Delta Electricity Production Company Date: 2006

Power Projects

Kureimat III Power Plant 750 MW

By: Upper Egypt Electricity Production Company (UEEPC) Date: 2005

Power Projects

Kureimat II Power Plant 750 MW

By: Upper Egypt Electricity Production Company (UEEPC) Date: 2003

Power Projects

Talkha Power Plant 750 MW

By: Middle Delta Electricity Production Company “MDEPC” Date: 2003

Power Projects

Nubaria III Power Plant 750 MW

By: Middle Delta Electricity Production Company “MDEPC” Date: 2005

Power Projects

Nubaria I & II Power Plant 1500 MW

By: Middle Delta Electricity Production Company “MDEPC” Date: 2002

Power Projects

Cairo North I 750 MW

By: Cairo Electricity Production Company Date: 2001

Power Projects

Cairo North II 750 MW

By: Cairo Electricity Production Company Date: 2003