The plant is located in Cairo Site. The facility is designed to include a 2x350 MW Thermal Power Plant for interconnection to the National Unified Power System (NUPS) through an extension of the existing GIS 500 KV Switchyard facility. The power block comprises two identical ranking cycle turbine generator units, each with a nominal rated capacity of 350 MW using natural gas, residual (mazout) oil, or a combination of both. The two-unit station arrangement including an enclosed Turbine building, an open boiler building, a common control room, and all associated structures and facilities.
Cairo Electricity Production Company
Egypt, Cairo
October 2006
Contract for Engineering, Procurement, Project, and Construction Management Services.
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects