The facility is designed to include a 2x350 MW thermal power plant for interconnection to the National Unified Power System (NUPS) through an extension of the existing GIS 500 KV switchyard facility.
The power block comprises 2 identical ranking cycle turbine generator units, each with a nominal rated capacity of 350 MW using natural gas, residual (mazout) oil, or a combination of both.
The 2 unit station arrangement including an enclosed turbine building, an open boiler building, a common control room, and all associated structures and facilities.
Cairo Electricity Production Company
Egypt , Cairo
October 2006
Contract for Engineering, Procurement, Project, and Construction Management Services.