PGESCO

BANHA POWER PLANT 750 MW

project details

BANHA POWER PLANT 750 MW

Region: Egypt Status: Completed

PLANT DESCRIPTION

Two 250 MW Combustion Turbine Generators (CTGs). Each one feeds exhaust gases to its respective unfired Heat Recovery Steam Generator (HRSG). Steam from the two HRSGs feeds one 250 MW, single reheat, condensing Steam Turbine Generator (STG).
The estimated 750 MW net output is achieved by burning natural gas in the CTGs without supplementary HRSG firing. Nitrogen oxides of nitrogen (NOx) emissions are con­trolled by dry low-NOx (DLN) combustors. An inlet air filtration system supplies filtered combustion air to the CTGs. The steam exhausted from the steam turbine feeds a once-through cooling, single-pass, divided water box condenser.
Power is generated at manufacturer standard voltage in the CTGs and the STG, stepped up through main transformers, and fed to the grid via a 220 kV, GIS switchyard. The Rayah Tawfiki provides the plant cooling water.
 

 

Project Details

Owner

Middle Delta Electricity Production Company

Location

Egypt, Dakahlia

Date of Award

April 2010

Scope

All Conceptual and Detailed Design of Plant Systems, Preparation of All Tenders, the Documents Included Commercial and Legal Terms and Followed the Financing Institutes and Owner Procurement Guidelines.

Project Management, Construction Management, Startup and Commissioning Management.