The project consists of 2x650 MW supercritical steam thermal power plant for interconnection to the National Unified Power System (NUPS) through the new 500/220 KV GIS switchyard facility.
The power block comprises two identical Rankine cycle turbine generator units, each with a nominal rated capacity of 650 MW.
The units should be capable of generating rated capacity using natural gas, residual (mazout) oil, or a combination of both.
The 2 unit station arrangement shall include an enclosed turbine building, an open boiler building, a common control room, and all associated structures and facilities.
East Delta Electricity Production Company
Egypt , Ain Sokhna
June 2008
Contract for Engineering, Procurement, Project, and Construction Management Services.