Cairo West power project is designed to include one 650 MW steam thermal power plant to interconnect with the National Unified Power System (NUPS) through a 500/220 KV GIS switchyard.
The power block is comprised of one Rankine cycle sub-critical turbine generator unit with a nominal rated capacity of 650 MW. The unit is capable of generating rated capacity using natural gas and/or heavy fuel oil (mazout). The unit arrangement includes an in-door turbine building, an out-door boiler structure, a control room, and all associated structures and facilities.
The project contracting plan utilized a multi-package system. Seventeen (17) contracting packages and purchase orders procured the equipment and services.
Cairo Electricity Production Company
Egypt, Cairo
July 2015
Contract for Engineering, Procurement, Project, and Construction Management Services.
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects
Power Projects