Include one 650 MW steam thermal power plant to interconnect with the National Unified Power System (NUPS) through a 500/220 KV GIS switchyard.
The power block is comprised of one Rankine cycle sub-critical turbine generator unit with a nominal rated capacity of 650 MW.
The unit is capable of generating rated capacity using natural gas and/or heavy fuel oil (mazout).
The unit arrangement includes an in-door turbine building, an out-door boiler structure, a control room, and all associated structures and facilities.
The project contracting plan utilized a multi-package system. 17 contracting packages and purchase orders procured the equipment and services.
Cairo Electricity Production Company
Egypt , Cairo
July 2015
Contract for Engineering, Procurement, Project, and Construction Management Services.