New West Damietta ADD-On Power Plant 250 MW

project details

New West Damietta ADD-On Power Plant 250 MW

Region: Egypt Status: Completed

PLANT DESCRIPTION

One (1) GE Steam Turbine Generator (STG) and associated Balance of Plant Systems, including four Heat Recovery Steam Generators (HRSGs) with auxiliary systems, an Air-Cooled Condenser, and Steam cycle piping & support. The power generated is stepped up to 220 kV through main transformers and supplied to the utility. Ground water serves as the raw water source. Key components/systems encompass the Power Block (Steam Turbine, Generator, and Auxiliaries) and the Air-Cooled Condensers. The Balance of Plant encompasses Transformers, Switchgear, Distributed Control System (DCS), and other Mechanical/Electrical Systems. 220 kV Gas Insulated Switchgear (GIS) extension.

 

Project Details

Owner

East Delta Electricity Production Company

Client

Orascom Construction (GE’S Partner in the EPC Consortium)

Location

Egypt, Damietta

Date of Award

August 2015

Scope

Engineering, procurement, project and construction management.