PGESCO

New West Damietta ADD-On Power Plant 250 MW

project details

New West Damietta ADD-On Power Plant 250 MW

Region: Egypt Status: Completed

PLANT DESCRIPTION

One (1) GE Steam Turbine Generator (STG) and associated Balance of Plant Systems, including four Heat Recovery Steam Generators (HRSGs) with auxiliary systems, an Air-Cooled Condenser, and Steam cycle piping & support. The power generated is stepped up to 220 kV through main transformers and supplied to the utility. Ground water serves as the raw water source. Key components/systems encompass the Power Block (Steam Turbine, Generator, and Auxiliaries) and the Air-Cooled Condensers. The Balance of Plant encompasses Transformers, Switchgear, Distributed Control System (DCS), and other Mechanical/Electrical Systems. 220 kV Gas Insulated Switchgear (GIS) extension.

 

Project Details

Owner

East Delta Electricity Production Company

Client

Orascom Construction (GE’S Partner in the EPC Consortium)

Location

Egypt , Damietta

Date of Award

August 2015

Scope

Engineering, procurement, project and construction management.

Related Project