The facility is designed to include a 2x350 MW thermal power plant for interconnection to the National Unified Power System (NUPS) through the new GIS 220 KV switchyard facility.
The power block comprises 2 identical rankine cycle turbine natural gas, residual (mazout) oil, or a combination of both.
The 2 unit station arrangement shall include an enclosed turbine building, an open boiler building, a common control room and all associated structures and facilities.
The facility will include water treatment plant that will provide makeup water to the cycle.
A new 220 KV GIS switchyard will be constructed to deliver the generated power to the national grid.
Cairo Electricity Production Company
Egypt , Cairo
May 2005
Contract for Engineering, Procurement, Project, and Construction Management Services.