PLANT DESCRIPTION

West Damietta power project includes desalination and water/wastewater treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well the various power plant users. Ground Water is supplied via deep well field to feed the desalination and water treatment systems. The desalination and water/wastewater treatment installed in West Damietta power project includes:

Project Details

Owner

East Delta Electricity Production Company

Location

Egypt, Damietta

Date of Award

May 2005

Scope

Engineering Consultancy Services

Engineering, Procurement, and Construction Management Services.

Intake Design

Open Intake

Pretreatment System

Ultra filtration modules (UF)

2 x 2880 m3/day

Desalination     System

Double pass reverse osmosis (brackish water)

2 x 1560 m3/day

Demineralization System

Mixed bed deionizer

2 x 1560 m3/day

Condensate polisher System

Pre-coat filters 

2 x 600 m3/h

Wastewater treatment system

Oil separation / clarification / filtration / pH adjustment  

1200  m3/day

Related Project

Water Solutions

West Damietta Simple Cycle Fast Track Power Project

By: East Delta Electricity Production Company Date: 2005

Water Solutions

Sidi Krir Combined Cycle Power Project

By: West Delta Electricity Production Company Date: 2003

Water Solutions

Al Atf Combined Cycle Power Project

By: West Delta Electricity Production Company Date: 2003