PLANT DESCRIPTION
El Kuriemat power project includes water/wastewater treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well the various power plant users. raw water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The desalination and water/wastewater treatment installed in El Kuriemat power project includes:
Upper Egypt Electricity Production Company
Egypt, Giza
May 2003
Engineering Consultancy Services
Engineering, Procurement, and Construction Management Services.
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions