PLANT DESCRIPTION
TALKHA power project includes water/wastewater treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well the various power plant users. River water from Nile River is supplied via intake structure to feed the water treatment system through power plant pump house where supply pumps and raw water screens is located. The water/wastewater treatment installed in Talkha power project includes:
East Delta Electricity Production Company
Egypt, Dakahlia
May 2003
Engineering Consultancy Services
Engineering, Procurement, and Construction Management Services.
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions