PLANT DESCRIPTION
Sidi Krir 5 &6 power project includes water/wastewater treatment systems to serve the plant water demand of high purity demineralized water required for boiler feed as well the various power plant users. Sea water from Mediterranean Sea is supplied via intake structure to feed the existing desalination plant and water/wastewater treatment system through power plant pump house where supply pumps and sea water screens is located. The desalination and water/wastewater treatment installed in Sidi Krir 5&6 power project includes:
West Delta Electricity Production Company
Egypt, Alexandria
May 2003
Engineering Consultancy Services
Engineering, Procurement, and Construction Management Services.
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions
Water Solutions