PGESCO scope included design review, site supervision and project management of Zwitina Combined Cycle 250 MW a -on Project. The scope also included plant material inspection and performance testing for all plant equipment. The scope is to convert the existing 2 X 250 MW Gas Turbine Power Plant into a 2X2X1 Combined Cycle Power Plant for a total capacity of 750 MW.

Project Details

Owner

General Electricity Company of Libya

Client

ACESCo

Location

Libya, Al Wahat

Date of Award

August 2010

Scope

Engineering, Procurement, Project Management and Construction Services of the 570 MW Zwaitina single cycle power plant project 

 

Related Project

Power Projects

Obari Power Plant 4 x 160 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2010

Power Projects

Sarir Power Plant 3 X 285 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2007

Power Projects

Western Mountain Extension Power Plant 2 X 156 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2007

Power Projects

Western Mountain Power Plant 4 x 156 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2003

Power Projects

Zawia Power Plant 2 x 150 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2004

Power Projects

ZWITINA 570 MW SIMPLE CYCLE

By: General Electricity Company of Libya Date: 2011

Power Projects

Lamlouda Power Plant 3x50 MW-Simple Cycle

By: USP LY / Ras Al Khaimah United Arab Date: 2017

Power Projects

Misrata Power Plant 750 MW

By: ACESCO - GAEREL Date: 2007

Power Projects

Susa 3x300 MW Power Project

By: USPE-LY / Ras Al Khaimah United Arab Emirates Date: 2018

Power Projects

Benghazi West 2000 MW

By: General Electricity Company of Libya Date: 2018