PGESCO

Benghazi West 2000 MW

project details

Benghazi West 2000 MW

Region: Libya Status: Completed

 

Plant Description 

 

Located about 15 km South West of Benghazi, Libya,  consists of 2 modules, each configured as a 2x2x1 setup, featuring desalination and potable water plants.

The key equipment in each module includes 2 indoor CTG units with a nominal rating of 315-330 MW, 2 outdoor 3 pressure HRSGs, 1 indoor condensing reheat STG unit with a nominal rating of 330 MW, a steam surface condenser, 2 RO desalination trains producing 30,000 m3/day, 2 potable water trains generating 25,000 m3/day, a lifting pump station for transferring potable water to the city, a natural gas reducing station with various equipment for conditioning the gas, a 220 kV Gas Insulated Switchyard, and a once-through cooling water system with several components including a surface condenser, circulating water pumps, and a debris filter. Additionally, Distributed Control System (DCS) is implemented to manage the combined cycle facility.

 

Project Details

Owner

General Electricity Company of Libya

Location

Libya , Benghazi

Date of Award

November 2018

Scope

Consultancy Services Agreement 

Related Project