Susa 3x300 MW Power Project

Region: Libya Status: On Going

PLANT DESCRIPTION


Susah power plant is located on Libya shoreline at eastern region in Susah town. The plant is designed to generate Nominal power of 2x300 MW for Phase I (Simple Cycle operation) at ISO conditions, and with overall nominal generated capacity of 900 MW (for Phase I & Phase II) at ISO conditions. GAEREL has developed fast track program to secure the urgent power demand for this region, Susah power plant Phase I (Simple Cycle Operation) is designed to support this program.

Susah power plant Phase I consists of two (2) Gas Turbine Generators, Fuel System, Power Transformers, Switchgears, other auxiliaries, and Control systems.

Project Details

Owner

USPE-LY / Ras Al Khaimah United Arab Emirates

Location

Libya, Susa

Date of Award

November 2018

Scope

Engineering, procurement, project and construction management.

Related Project

Power Projects

Obari Power Plant 4 x 160 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2010

Power Projects

Sarir Power Plant 3 X 285 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2007

Power Projects

Western Mountain Extension Power Plant 2 X 156 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2007

Power Projects

Western Mountain Power Plant 4 x 156 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2003

Power Projects

Zawia Power Plant 2 x 150 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2004

Power Projects

ZWITINA 570 MW SIMPLE CYCLE

By: General Electricity Company of Libya Date: 2011

Power Projects

Lamlouda Power Plant 3x50 MW-Simple Cycle

By: USP LY / Ras Al Khaimah United Arab Date: 2017

Power Projects

Zwitina Power Plant Add-on 250 MW

By: General Electricity Company of Libya Date: 2010

Power Projects

Misrata Power Plant 750 MW

By: ACESCO - GAEREL Date: 2007

Power Projects

Benghazi West 2000 MW

By: General Electricity Company of Libya Date: 2018