Misrata Power Plant 750 MW

project details

Misrata Power Plant 750 MW

Region: Libya Status: Completed

PLANT DESCRIPTION


Engineering Consultancy Services 750 MW
The plant consists of a 750 MW module (nominal). The module consists of two 250 MW (nominal, ISO) Combustion Turbine Generators (BMS), each feeding the exhaust gases to its non-combustion heat recovery steam generator (HRSG) without additional ignition. Steam from the two HRSGs is sent to a 250 MW (nominal) Condensing Steam Turbine Generator (STG), preheater.

Project Details

Owner

ACESCO - GAEREL

Location

Libya, Misrata

Date of Award

May 2007

Scope

Engineering, procurement, site supervision and project management of Misurata Combined Cycle Power Plant 2X2X1.

The scope also included plant equipment material inspection and performance testing.

Related Project

Power Projects

Obari Power Plant 4 x 160 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2010

Power Projects

Sarir Power Plant 3 X 285 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2007

Power Projects

Western Mountain Extension Power Plant 2 X 156 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2007

Power Projects

Western Mountain Power Plant 4 x 156 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2003

Power Projects

Zawia Power Plant 2 x 150 MW

By: General Authority of Electricity and Renewable Energy of Libya Date: 2004

Power Projects

ZWITINA 570 MW SIMPLE CYCLE

By: General Electricity Company of Libya Date: 2011

Power Projects

Lamlouda Power Plant 3x50 MW-Simple Cycle

By: USP LY / Ras Al Khaimah United Arab Date: 2017

Power Projects

Zwitina Power Plant Add-on 250 MW

By: General Electricity Company of Libya Date: 2010

Power Projects

Susa 3x300 MW Power Project

By: USPE-LY / Ras Al Khaimah United Arab Emirates Date: 2018

Power Projects

Benghazi West 2000 MW

By: General Electricity Company of Libya Date: 2018