300 Km, El Ousair/ Marsa Alam/ Bernes 220 KV OHTL- double-circuit, twin-bundle conductor, divided into 6 lots each lot is approximately 50 km.
Egyptian Electricity Transmission Company
Egypt, Southeast Coast
August 2019
Full PMC and CM services for Southeast Coast development of a new Transmission line with associated substations project including design review, equipment, and material inspection.