PGESCO

AOI Pumps Factory, PMC services

project details

AOI Pumps Factory, PMC services

Region: Egypt Status: Completed

DESCRIPTION

Integrated management model for the pumps facility located inside AOI Engines factory by developing integrated management system that includes factory guidance for operation, personnel development, and facility efficiency to qualify the factory to comply with the international market standards.

The scope of services is:

  1. Integrated Production Management Handbook. 
  2. Factory Gap Analysis to qualify produced pumps to international market.
  3. Production Resource management digital transformation Roadmap. 
  4. Engineering and construction management services at Pumps workshop. 

 

Project Details

Owner

AOI Engine Factory / Pumps Factory

Location

Egypt, Cairo

Date of Award

June 2021

Scope

Effort for the professional project consultancy services during the project implementations and through the consulting services contract duration.

Related Project

Industrial Projects

Heidelberg Cement Group

By: Heidelberg Cement Group Date: 2021

Industrial Projects

10th Of Ramadan HA Industrial Complex

By: Hassan Allam Construction Date: 2022

Industrial Projects

Nova Industries S.A.E.

By: Ciclo Industries Date: 2022

Industrial Projects

East Cairo Logistics Parks – Hassan Allam Logistics Parks

By: Hassan Allam Logistics Parks (HALP) Date: 2022

Industrial Projects

Black Sand Project

By: Mineral Technologies Pty Ltd (MT) Date: 2020

Industrial Projects

Internal Trade Development Authority Warehouse Projects (Luxor and Sharqia)

By: Hassan Allam Logistics Parks (HALP) Date: 2022

Industrial Projects

AOI SEMAF Interconnection (Helwan) Owner Engineer

By: Arab Organization for Industrialization - SEMAF Factory Date: 2021

Industrial Projects

ELMACo Transformers Factory Project

By: El Nasr Transformers and Electrical Products Company Date: 2009