Wassit I&II 2580 MW Thermal Power Project

project details

Wassit I&II 2580 MW Thermal Power Project

Region: Iraq Status: Completed

PLANT DESCRIPTION

Wassit Steam Power Plant project is a two-phase project located in Zobidia, Wassit Governorate, Iraq; 137 Km East south of Baghdad. Phase II consists of 2 x 630 MW units. The contractor’s scope of work includes the design, equipment and material procurement, factory fabrication, transport and delivery to site, erection, testing and commissioning. Furthermore, it is the responsibility of the contractor to perform plant startup including getting all plant sections into operation. Additionally, the contractor is responsible for performance and reliability testing of the plant upon completion followed by a warranty period after the issuance of Provisional Acceptance Certificate “PAC”. The project is being executed on an EPC Contract “Turnkey” basis. The contracting plan for the project utilizes the EPC concept. PGESCo, the Owner Engineer, is responsible for providing engineering consultancy services.

Project Details

Owner

Ministry of Electricity of Iraq

Location

Iraq, Wassit

Date of Award

July 2014

Scope

Engineering Consultancy Services thermal 2x630 total MW 1260

Related Project

Power Projects

Salah El Din 2x630 MW Thermal Power Project

By: Ministry of Electricity of Iraq Date: 2014

Power Projects

Baiji POWER PLANT 1014 MW (6XSGT5-PAC 2000E, DUAL FUEL + HEAVY FUEL OIL

By: Ministry of Electricity of IRAQ Date: 2012