Region: Libya Status: Completed

PLANT DESCRIPTION

 

100 Km, Brak – Sabha 220 KV OHTL- double-circuit, twin-bundle conductor. 

100 Km, Rwes – Bir Ganam 220 KV OHTL- double-circuit, twin-bundle conductor. 

1000 Km, (Zaiwa-Sidi Banour 500Km and Sirt-Agdabia 500Km) 400KV OHTL- double-circuit, twin-bundle conductor. 

260 Km, SABHA – GAMRA 400KV OHTL- double-circuit, twin-bundle conductor.

PGESCO scope is full PMC and CM services for a Transmission line including design review, equipment and material inspection and performance testing as well as training and technology transfer to GPCOEWG (General People’s Committee of Electricity, Water and Gas).

 

Project Details

Owner

General Electricity Company of Libya (GECOL)

Location

Libya, Brak-Sabha Rwes-Bir Ganam SABHA – GAMRA

Date of Award

January 2014

Scope

 full PMC and CM services for a Transmission line including design review, equipment and material inspection and performance testing. 

Related Project

Over Head Transmission

1000KM 400 kV OHTL

By: ACESCo/GAEREL Date: 2008

Over Head Transmission

Sabha Gamra 400 kV OHTL

By: ACESCo/GAEREL Date: 2014

Over Head Transmission

Rwes – Bir Ganam 220 kV OHTL

By: ACESCo/GAEREL Date: 2014

Over Head Transmission

Brak – Sabha 220 kV OHTL

By: ACESCo/GAEREL Date: 2014