Design Review, Site Supervision And Project Management of The Project. The Scope Also Included Plant Equipment, Material Inspection And Performance Testing As Well As Training And Technology Transfer To GPCOEWG (General People’s Committee of Electricity, Water and Gas).
The Project Consists of Two (2) 400kV Overhead Transmission Lines With Total Length of 1000 Km.
The First Line Is Zawia-Sidi Banour (500 Km) And The Second Line Is Sirt -Agdabia (500km).
ACESCo/GAEREL
Libya, Zawia-Sidi Banour / Sirt -Agdabia
January 2008
Over Head Transmission