Project
Feasibility Studies of Tobruk, Tripoli and Benghazi Desalination and Power Co-Generation Plants Study
Client
General Electricity Company of Libya/Arabian Consulting Engineering Services Company
Location
Libya
Scope
The Feasibility Studies Included Technical and Economical Optimization for Each Site (Tobruk, Tripoli and Benghazi) to Allow for the Most Flexible Water and Power Production. The Cogeneration Plants Configuration Varied From 400 MW to 750 MW Power Production and 250,000 M3 /Day to 500,000 M3/Day Water Production.