Project
Steam ADD-ON Combined Cycle
Client
Orascom Construction /Baiji
Location
Iraq
Scope
Evaluation and Optimization of Steam Add-On CC Power Plant for the Existing Gts Firing HFO, as an Upgrade for the Baiji Project. The Study Included the Steam Parameters and Pressure Levels of the Heat Recovery Steam Generators. Also, the Study Included the Cooling Technologies to Suit the Existing Plant.