PGESCO

Pre-Feasibility Study for The Coal Fired Power Plant 2X200 MW - 800 MW

Pre-Feasibility Study for The Coal Fired Power Plant 2X200 MW - 800 MW

Project 

Pre-Feasibility Study for The Coal Fired Power Plant 2X200 MW - 800 MW

Client 

Orascom Construction/ International Petroleum Investment Company

 

 

Scope

The Pre-Feasibility Study Report Developed over two Stages Where the First Stage is to issue the “Draft Baseline Report” that Shall Address All Technical Opportunities and Approaches, This Stage Shall Conclude Base Configuration of the Power Plant, Selected Technology, Coal Parameters, Supply and Logistics to be Used as Inputs for the Second Stage of “Inputs to Financial Modeling.”