Project
Pre-Feasibility Study for The Coal Fired Power Plant 2X200 MW - 800 MW
Client
Orascom Construction/ International Petroleum Investment Company
Scope
The Pre-Feasibility Study Report Developed over two Stages Where the First Stage is to issue the “Draft Baseline Report” that Shall Address All Technical Opportunities and Approaches, This Stage Shall Conclude Base Configuration of the Power Plant, Selected Technology, Coal Parameters, Supply and Logistics to be Used as Inputs for the Second Stage of “Inputs to Financial Modeling.”