PGESCO

MIDELEC Tie Transformer Study

MIDELEC Tie Transformer Study

Project 
 
MIDELEC Tie Transformer Study
 
Client 
 
MIDOR Electricity Co.
 
Date
 
April 2020
 
Location 
 
Alexandria

Scope

Engineering Studies Services 

Assess the need for exercising the 33/66 kV Tie Transformer to be connected between MidElec’s (Expansion Project) and tied to the 66KV Unified National Grid.