Engineering Studies Services.
Study the well-timed decoupling and following load shedding to ensure continued operation following faults and to avoid the total loss of the refinery, the scope of work includes the following activities as following:
- Data collection
- ETAP modeling for the electrical network considering national electrical network interconnection
- Data verification
- Load flow analysis
- Transient stability study
- Decoupling device and load shedding study
- Decoupling device setting