Bapetco Centralization

Bapetco Centralization

Project 

Bapetco Centralization

Client 

Badr El-Din Petroleum Company (BAPETCO)

Location 

EGYPT

Scope

This study aims to utilize the existing spare generation capacity at bed-3 (approximately 4 mw) to distribute power directly to the wells. The intension of the engineering efforts is to supply detailed design engineering works, including any modification required in the existing facilities in Bed-3 plant and design the required facilities at Bed-18 to achieve the objectives.