project details

Brak – Sabha 220 KV OHTL Rwes – Bir Ganam 220 kV OHTL Sabha – Gamara 400 KV OHTL

Region: Libya Status: Completed

 

Description

100 Km, Brak Sabha 220 KV OHTL double circuit, twin bundle conductor. 

100 Km, Rwes Bir Ganam 220 KV OHTL double circuit, twin bundle conductor. 

1000 Km, (Zaiwa-Sidi Banour 500Km and Sirt-Agdabia 500Km) 400KV OHTL double circuit, twin bundle conductor. 

260 Km, SABHA GAMRA 400KV OHTL double circuit, twin bundle conductor.

PGESCO scope is full PMC and CM services for a transmission line including design review, equipment and material inspection and performance testing as well as training and technology transfer to GPCOEWG (General People’s Committee of Electricity, Water and Gas).

 

Project Details

Owner

General Electricity Company of Libya

Location

Libya , Brak-Sabha

Date of Award

January 2014

Scope

Full PMC and CM services for a Transmission line including design review, equipment and material inspection and performance testing. 